STAGE 1

.

Cylinder rebuilding schedule to Stage One

.
preb11.jpg (52618 bytes) The machine is split into its three major components and the cylinder is removed. The crown wheel is removed and all white walled bearings are inspected and replaced where necessary.

The ratchet tension bar on the cylinder is removed and a slot is cut into the bar to assist with the tensioning of make ready material.

.
preb17wwb.jpg (50935 bytes) On replacing the cylinder, all bearings are checked, lead screws are inspected, freed and replaced where necessary.

Delivery: all cam tracks are checked and replaced where necessary. All chains are checked and replaced where necessary. Delivery grippers are checked and replaced where necessary.

.
preb3.jpg (52909 bytes) Feeding Section: Check for all worn parts, especially fed lift tables and in-feed grippers. All worn and damaged parts are replaced.

Air-system pump removed and serviced, all air pipes are replaced.

.
reb21.jpg (66574 bytes)

The machine is then re-assembled by our experienced engineers, and each stage of the rebuild is checked and lubricated as required, ensuring that the manufacturers tolerances and are observed at all times to ensure the smooth operation of the machine.